A manufacturing work order is a production order: it names the part, the quantity, the materials to draw from stock, and the operations to run, in sequence, at named work centers. The form below is loaded with a typical short production run — swap in your part number, bill of materials, and routing, then download the traveler for the floor.

A sample manufacturing job is preloaded below — edit every field, then download the PDF. Free, no signup.

Work order
WO number (auto)
Priority
Date issued
Date needed
Date completed
Company
Company name
Phone
Email
Address
People & location
Requested by
Requester contact
Assigned to
Assignee contact
Location
Asset / equipment
Description of work
Parts & materials
$576.00
$90.00
$310.00
$85.00
Labor
$155.00
$289.00
$357.50
$144.00
$72.50
Tax, notes & sign-off
Tax rate %
Notes
Company Name
WORK ORDER
WO-1001
Date issued
Sep 1, 2026
Date needed
Priority
Medium
Date completed
Requested by
Assigned to
Location
Plant 2 — cell 4 (WC-110 shear, WC-140 press, WC-220 weld)
Asset / Equipment
Part BRK-2210 rev C · lot MFG-2210-0416 · qty 250
Description of work

Production run: 250 pcs of BRK-2210 rev C mounting bracket against sales order SO-8841, lot MFG-2210-0416. Blanked from 11 ga hot-rolled sheet, formed and pierced on the 60-ton press at WC-140, weld nuts inserted two per part, deburred, powder coated RAL 7016 and packed 25 to a carton. First article checked against print rev C at op 20 and signed off before the balance of the run. Final count 247 good, 3 scrapped at weld (nut cocked), scrap logged against the lot.

Parts & Materials
PART / MATERIAL
QTY
UNIT COST
TOTAL
Steel sheet, 11 ga HR, 48 x 96 (blanks)
9
$64.00
$576.00
Weld nut, 3/8-16 zinc (2 per part)
500
$0.18
$90.00
Powder coat, RAL 7016 — lot charge
1
$310.00
$310.00
Consumables — shielding gas, tips, cutting fluid
1
$85.00
$85.00
Parts total
$1,061.00
Labor
LABOR / TASK
HOURS
RATE
TOTAL
Op 10 — shear and blank 250 pcs, WC-110
2.5
$62.00
$155.00
Op 20 — press form and pierce, WC-140 (incl. 0.75 setup)
4.25
$68.00
$289.00
Op 30 — insert and weld nuts, WC-220
5.5
$65.00
$357.50
Op 40 — deburr, hang for coat, pack 25/carton
3
$48.00
$144.00
Op 50 — first article and final inspection
1.25
$58.00
$72.50
Labor total
$1,018.00
TOTAL$2,079.00
Notes

Lot MFG-2210-0416. Material heat number recorded on the traveler at op 10 and carried to the packing list. First article signed by QC before the balance of the run. 3 pcs scrapped at op 30 (weld nut cocked in fixture) — scrap logged against the lot, not written off to overhead. Fixture F-140-3 showed wear on the locating pin; flagged for the tooling crib rather than stopping the run.

Authorized by (signature)
Print name
Date
Created with work-order-template.comPage 1 of 1
WO-1001
$2,079.00

A production order is a work order with a quantity on it

The difference between a maintenance work order and a manufacturing work order is that the manufacturing one has a number of pieces on it. Everything else follows from that. The header names the part number and revision, the quantity to produce, the sales or stock order it is being made against, and the lot or batch number that the finished goods will carry. Without those four the paperwork cannot answer the two questions a manufacturer actually gets asked: how much did this run cost per piece, and which parts in the field came off this lot.

Write the revision, not just the part number. A shop that runs BRK-2210 for three years will run it to four different prints, and a traveler that says only "BRK-2210" is a traveler that eventually builds the wrong one. The revision on the order and the revision on the print in the operator's hand should be checked against each other at the first operation, and the person who checked should be on the form.

The bill of materials and the routing are the two tables

Materials issued to the order go in the parts table: raw stock by the sheet, bar, or pound, purchased components by the piece, and the finishing and consumables that a run genuinely eats. Quantity matters more here than on a service work order, because it is what makes the per-piece math honest — nine sheets across 250 parts is a real material cost per bracket, and a run that issues twelve sheets because two were scrapped in setup is a different cost that you want to see rather than absorb.

The routing goes in the labor table, one line per operation, in sequence, with the work center named and the hours split. Op 10 shear, op 20 press, op 30 weld, op 40 finish, op 50 inspect. Keep setup visible — it is the single biggest reason small runs cost what they do, and a shop that blends setup into run time will keep quoting short runs as though they were long ones. Different work centers usually carry different rates, and separate lines let those rates coexist on one order instead of averaging into a number that describes nothing.

Scrap, lot traceability, and what the closed order proves

Record the quantity started and the quantity accepted, and put the difference somewhere with a reason. Scrap that is charged to the lot tells you which operation is losing parts; scrap that quietly disappears into overhead tells you nothing and shows up later as a yield problem nobody can locate. Three parts lost at the weld fixture is a tooling note today and a fixture rebuild next quarter — but only if the number is on the order.

Lot traceability is the reason a manufacturing work order outlives the run. Carry the material heat or lot number from the raw stock onto the order, and the order's lot number onto the packing list, and a customer question about a bracket that cracked in the field resolves to a specific coil of steel and a specific shift. Regulated sectors require that chain; everyone else discovers they wanted it the first time a recall question arrives. Close the order with the completion date, the accepted quantity, and an inspection sign-off, and the document becomes proof that the parts you shipped were made to the print you were given.

Manufacturing work order FAQ

What is a manufacturing work order?

A production order that authorizes making a specific quantity of a specific part: part number and revision, quantity, the bill of materials to issue from stock, the routing of operations at named work centers, and the lot number the finished goods carry. It is the traveler that follows the job across the floor and the cost record when it closes.

Is a production order the same as a manufacturing work order?

Yes — 'production order,' 'manufacturing order,' 'shop order,' 'job order' and 'traveler' are all names for the same document. ERP systems tend to say production order; the floor tends to say traveler or job. The fields do not change.

How do you show setup time on a manufacturing work order?

As part of the operation line it belongs to, called out rather than hidden — 'Op 20 press form, incl. 0.75 setup.' Setup is what makes short runs expensive per piece, so a shop that blends it into run time will keep under-quoting small orders and never see why.

Where does scrap go on the form?

In the notes with a quantity and the operation it happened at, and reflected in the accepted quantity at close. Scrap charged to the lot points at the operation losing parts; scrap absorbed into overhead becomes a yield problem with no address.